Mobile view: 2D Map, Reports, Export & Zone Table are fully supported. 3D Viewer, Block Model & Drillholes work best on desktop/laptop.
SYNTHETIC DATAAll geological data on this platform is computer-generated. Not a Mineral Resource under JORC / NI 43-101.Computer-generated data · Not JORC / NI 43-101
Pixel Inspector
Zones colored by Au grade (g/t) — hover to preview · click for full details
3D Geological Viewer
Upload Anomalies GeoJSON + Terrain OBJ in the sidebar to begin visualising the deposit in 3D
Measurement
Click first point on the 3D scene
3D Distance—
H Distance—
V Difference—
Bearing—
Slope—
Click to place points · click the ruler button again to exit
SYNTHETIC DATA — Exploration Target Only
Zone Z—
Grade—
Signal—
Confidence—
Rec. Depth—
Value—
Tier—
Latitude—
Longitude—
Min Depth—
Max Depth—
Avg Depth—
Vein Network
Latitude—
Longitude—
Elevation—
Grade
Easting | Northing | Depth
Scene Guide
Layers
Grid & AxesEast · North · Depth reference
Terrain SurfaceTopographic mesh
Vein NetworkStructural vein geometry
Anomaly ZonesGrade-colored · click for details
Grade BlocksPer-block Au g/t (viridis scale)
DrillholesDrill traces · green spheres = collar (surface entry point)
Pit ShellMine boundary · SYNTHETIC
Orebody SolidOre envelope · SYNTHETIC
How to Navigate
Drag to rotate · Scroll to zoom
Click zone sphere → full details
Section Cut → see inside deposit
Toggle layers in sidebar
Source
anomalies.geojson
Zone Comparison Table
Upload anomalies.geojson using the bar above to load zone data.
Fetching live gold price…
NSR values will be calculated using the current market price
All zones
Section: E-W through origin
Isopach — Mineralised Thickness per Hole
Elevation Z:— m
Hole:
Buffer:Colour:
Plan View — drag handles to reposition section line
Load collar + assay CSV files to use the section editor
Drill Cost Estimator
Hole
Zone
Depth (m)
Estimated Cost
Grade Control — Blasthole Layout
Grade Capping97thCap: — g/t
Drillhole QAQC
Downhole Statisticsg/t
Stratigraphic EditorDrag rows to reorder formation sequence (surface → depth)
Load synthetic_litho.csv to use the stratigraphic editor.
Drill Gap Analysis
IDW Grade Interpolation
Drillhole Explorer
Upload Collar + Survey + Assay CSV files in the sidebar to visualise drillholes
Depth
Grade
Zone
Lat / Lng—
↑
N
500 m
Significant Intercepts▲
scroll·zoom drag·pan
⚠No commodity detected — defaulting to Gold. Load ASSUMPTIONS.json or a GeoJSON with metal-specific grade columns (e.g. CU_PCT) to change this.
Inputs 0 of 7 loaded
Conceptual pit only. Optimised with the floating-cone algorithm, which can over- or under-mine compared with Lerchs–Grossmann or pseudoflow. Not suitable for feasibility-level studies.
Grade–Tonnage CurveOre and average grade above each cut-off
Shows how much ore and gold is available at each minimum grade cutoff. Higher cutoff = less but richer ore. Drag the slider to see how resource size changes.
Expected ore left axis, kt
Ore in pit
Average grade right axis, g/t
At cut-off — g/tExpected ore—Avg grade—Metal—
0.50 g/t
Ore (expected)—
Average grade—
Contained metal—
Envelope tonnes—
Density correctionAdvisory · synthetic_density.csv
2.700
→
—
—
—
Bench profile by elevationOre and waste by 10 m bench
Each bar is one 10m bench level of the open pit. Shows how ore and waste are distributed with depth. RL = Reduced Level (elevation above sea level). Grade line shows gold content per bench.
Total ore—kt
Total waste—Mt
Strip ratio—
Ore benches—
↑ surface · pit floor ↓Waste tonnes, kt
Life-of-Mine Schedule
Life of mine
—
Total ore
—
End cashflow
—
Payback
—
Pit Summary & Economics
Gold price$4,067/oz
adjust costs & discount
Full LOM scenario
$4.5/t
$22/t
88%
8.0%
Base NPV
—
Scenario NPV
—
Payback year
—
NPV Δ
—
Min. required price—
Payback year—
NPV efficiency—
Mining scenarios
NPV sensitivity
Row:Col:
Advanced economics
Post-tax analysis from the full LOM cashflow, year by year
Enter upfront Capex, government royalty rate and corporate income tax rate. Pre-tax and post-tax NPV/IRR are computed from the full LOM cashflow year-by-year. Updates instantly on any change.
Capex
$
M
Upfront capital
Royalty
%
On revenue
Income tax
%
On EBIT
Pre-tax to post-taxUSD millions
Live recompute
Economic zones, break-even grade and NPV at any gold price
Set a gold price with the slider or fetch the live market price. See how many zones become economic, the break-even grade, total gross value and estimated NPV from the pit model.
Gold price
$3,300/oz
$1,000$4,500$8,000
Move the slider or click Live to see how many zones are economic, the break-even grade and estimated NPV at any price.
Economic zones
—
Break-even grade
—
Total gross value
—M
Economic zones only, at this price
Est. NPV
—
Headline pit basis, costs included
Material tracking
Cumulative balance of rock moved, through the selected year
Shows cumulative ore and waste moved through the selected year of the life-of-mine schedule.
Rock moved to date
—Mt
Ore mined
—
Waste dumped
—
Mill feed
—
Strip ratio
—
Waste
Ore
Through year
Year 5of 20
Cut / fill volume analysis
Excavation depth between topography and pit shell
topo.dtm + pit_shell.dtm
Cut depth computed by comparing the topography surface to the pit shell surface on a 10 m grid.
Excavated volume
—m³
Max cut
—m
Avg cut
—m
Strip ratio
—
Plan view · cut depth
N
0 – 500 m
Depth distribution
Share of excavated cells
Median cut — m
ShallowDeep
⚗ Multi-Element NSR Calculator
$/tonne payable value from all elements
Total NSR:
—
$/tonne ore
Project cashflow waterfall
How life-of-mine revenue turns into NPV · USD millions
Value-destructive at current assumptions
Total value breakdown over the entire mine life. Shows how gross revenue is reduced by operating costs to arrive at undiscounted cashflow, then the discounting effect reduces it further to NPV.
RevenueCostDiscountingSubtotal
NPV at 8%
−$— M
Revenue vs operating cost
Where the cost goes
Production schedule
Annual ore, mill grade and NPV build-up · expected basis
PriorityAnnual ore
t/yr
Max years
Production schedule generated by sorting all blocks by priority and allocating them to annual ore buckets. Economics use the assumptions from the Mine Plan tab.
Schedule length
— years
Ore scheduled
— Mt
Gold produced
— oz
Revenue
— $M
Cum. NPV
— $M
Production & grade per year
WasteOreMill grade
Cashflow & NPV USD millions
Annual cashflowCum. NPV
Annual schedule
Confidence class breakdown
Expected ore and contained metal by exploration-target class
Ore tonnes and contained metal split by exploration confidence class. A = strongest satellite signal (low false-positive risk), C = weakest. Based on block model confidence codes from the detection report.
Outer · oreInner · metal
📋 LOM Schedule — Annual Data Table
Advanced analytics
AISC breakdown
All-in sustaining cost per oz of gold recovered
All-in Sustaining Cost — total operating costs divided by recovered units produced. Industry benchmark for mine economics. Does not include capex or royalties in this model.
NPV vs gold price
Project NPV across a range of gold prices · USD millions
Shows how project NPV changes across a range of commodity prices. Teal segment = above break-even. Red segment = below break-even.
NPVBase priceBreak-even
Resource confidence tiers
Ore tonnes at each cut-off · confirmed by satellite vs potential upside
Green = satellite-confirmed (Expected) ore tonnes at each cut-off grade. Gray = total geological envelope. The gap is speculative upside — ore that may exist but is not yet satellite-detected.
Approximate NPV at each cut-off grade · USD millions
Approximate NPV at each cut-off grade using the geological envelope. Peak point = economically optimal COG. Higher COG = richer ore but less volume; lower COG = more ore but diluted margins.
Advisory closure liability · adjust rates for site conditions
Closure cost
Revegetation
$/ha
Monitoring
years
Contingency
%
⚖ Material Balance — by 10-Year Period
3D pit fly-through
Camera flight through the pit shell, built from bench polygons
Colour by
Speed1.0×
ⓘ
Animated camera flying through the open-pit geometry built from bench polygon vertices. Each bench is coloured by the selected metric. Requires pit_limits.csv to be loaded.
No pit geometry yetLoad pit_limits.csv to enable the fly-through
No commodity detected — defaulting to Gold. Load ASSUMPTIONS.json or a GeoJSON with metal-specific grade columns (e.g. CU_PCT) to change this.
SourceCustom scenario
Gold price
—
$1,000$8,000
Recovery
—
50%100%
Total recoverable value
—
Active zones
—
Anomalies loaded
Avg recovery
—%
Value change vs base
—
Shareable linkCopied!
Zone values
Recoverable value by anomaly zone at the current price and recovery
Each row shows updated recoverable value for that anomaly zone. Amber badge = custom scenario active. Delta shows % change vs pipeline baseline.
Sensitivity tornado
Change in total value at ±10, 20 and 30% · USD millions
Shows total value swing at ±10%, ±20%, ±30% from baseline. Widest bar = biggest value driver.
DownsideUpsideWidest bar = most sensitive driver
Monte Carlo risk analysis
NPV and IRR across 1,000 random draws of the uncertain inputs
Iterations
NPV distribution
Simulated project NPV · USD millions
ⓘ
Histogram of simulated NPV outcomes. Red bars = loss runs (negative NPV). P10/P50/P90 lines show the 80% range of likely outcomes.
IRR distribution
Internal rate of return for runs that recover the investment · %
ⓘ
Internal Rate of Return across simulated scenarios that recover their up-front capital. P50 is the median expected return.
Risk tornado
NPV range (P10 to P90) when only one input varies by ±20% · USD millions
ⓘ
Each bar shows the P10–P90 NPV range when only that variable varies at ±20%. Widest bar = largest risk driver.
Run a simulation to see risk analysis.
P10 / P50 / P90 summary
NPV and IRR at each percentile of the simulation
ⓘ
NPV bars run from $0 to the left. IRR percentiles use only runs with a valid IRR, so they can look high when few runs recover capex.
A—
vs
B—
vsC—
vsD—
Overlap zone
⚖Load both projects and click ▶ Run AnalysisLoad 2–4 projects (A/B/C/D) and click ▶ Run Analysis to compare commodities
📋
JORC 2012 Statement
Load anomalies.geojson (and optionally ASSUMPTIONS.json) to generate the regulatory statement.
Document Details
All mandatory JORC 2012 caveats are pre-filled. Edit the fields above then use the print button to save as PDF.
Grade Block Model
|
Block Model Viewer
Load the ZIP file to visualise blocks
Grade Block Model
Axes
→ E
↑ N
↓ Z
Blocks
—
Grade range
—
Mean grade
—
Zones
—
Grade by zone
Grade by Zone
Load a ZIP file first to enable exports.
Data Export
Download block model, pit limits and drillholes in AutoCAD DXF R12 or Surpac .str format — ready for Leapfrog, Vulcan, Datamine and Geovia.
Block model
—
blocks loaded
Ready to export
Pit limits
—
vertices loaded
Ready to export
Drillholes
—
collars loaded
Ready to export
Individual layers
Block Model
Block centroids with grade, litho domain and confidence class. DXF uses POINT entities; STR uses the standard 5-field Surpac format.
—blocks
Colour layer by:
Include only:
Pit Limits
Bench polygons from pit optimisation, one ring per bench RL. DXF uses POLYLINE entities per bench layer; STR uses closed rings with 0,0,0,0,0 terminators.
—vertices
Drillholes
Collar positions (Easting, Northing, RL) with HoleID labels, plus optional 3-D survey traces. DXF uses POINT + POLYLINE; STR uses 1-point rings.
—collars
Include traces:
Bundles and reports
OMF Bundle
Open Mining Format v0.9
Single file bundling all loaded datasets. Compatible with Leapfrog, Vulcan, Datamine and Geovia.
Included
Block model—
Drillholes—
Pit shell—
Load data to enable.
PDF Report
Executive Summary
Print-ready report: JORC resource table, pit optimisation results, NPV/IRR, LOM production schedule and key assumptions.
Load data to enable.
DXF R12
ASCII AutoCAD R12 format — compatible with all versions of AutoCAD, MicroStation, Leapfrog, Vulcan and Surpac.
Surpac .str
Standard 5-field ASCII format (Northing, Easting, RL, attribute, description). Coordinates in project UTM system.
OMF v0.9
Open Mining Format — single-file bundle for multi-dataset transfer. Opens natively in Leapfrog Geo 5+, Vulcan 11+, and Geovia GEMS.
📄 Reports
📄
Load a ZIP file to view the analysis report
Grade Distribution
📊 Grade Distribution
🏔 DEM Surface
Vertical exag:
1×
Rendering DEM surface…
📡 Variogram Ellipsoid
Directional Variogram (optional — leave blank for omni)
Welcome to Mining Pro
Advanced 3D Mineral Exploration Analyzer
Upload ZIP
Explore 3D Viewer
Drillholes & Blocks
Mine Planning
📁 My Projects
Your mining project files
Loading projects…
📂
No projects found.
Project Name
Date
Size
Actions
Create Your Account
Start exploring mineral data
Min. 8 characters · uppercase · lowercase · number · special character (!@#$…)
2D Map & 3D Viewer are free. Subscribe to unlock all other features.
MONTHLY
$700
per month
30 days access
POPULAR
QUARTERLY
$1,800
per quarter
Save $300 vs monthly
ANNUAL
$6,500
per year
Save $1,900 vs monthly
Loading payment form…
Failed to load payment form. Please try again.
✓
Payment Successful!
Your subscription is now active. Redirecting you to the 2D Map…
Click ✕ to go there now
Loading…
?
🛡️
Admin — Full Access
Full Access Granted. Enjoy Everything
Share Project
You have a project uploaded. Add up to 2 viewers — they can load your project and access free tabs (Map & 3D Viewer).
📁
Project Viewer Access
You have been granted access to view a shared project. Use Latest Project or All Projects to load it.
🔒
No Active Subscription
Your access has been revoked or has expired. Please contact your account manager or subscribe to regain access.
Subscription
Plan
Expires
Shared Access
Grant access to up to 2 team members by email. Need more? Upgrade to Paid plan (up to 7 members, $80/extra).
Buy Extra Member Slots
You've reached your 7-member limit. Purchase additional slots to keep adding teammates.
Select Quantity
Additional members:
1
Price Breakdown
Rate
$80 / slot
Total
$80
$80 × 1 slot
ⓘMember access lasts as long as your subscription is active. If your subscription expires, access for all members including extra slots will be revoked.